Solutions for improving the efficiency of human resource planning in welding operations at TS Vietnam Co., Ltd.

Abstract

Welding lines are highly labor-intensive operations that depend critically on worker skill and the coordination between personnel and equipment, rendering human resource planning complex and prone to variability. This study examines the current state of workforce planning and utilization in the welding line of TS Vietnam Co., Ltd., with a focus on identifying sources of inefficiency and suboptimal labor allocation. Through systematic analysis, the findings reveal key factors contributing to resource waste and operational imbalances. The study thus provides an evidence-based assessment of how Lean and Kaizen principles can be applied to improve workforce efficiency and optimize production performance in manufacturing settings.
Keywords
workforce plan Lean Manufacturing welding line

References

1.
Nguyễn Văn Nghiến (2009), Quản lý sản xuất và tác nghiệp. NXB Giáo dục.
2.
Nguyễn Đạt Minh (2018), Phương pháp sản xuất Lean - Lý thuyết và một số nghiên cứu triển khai tại Việt Nam. NXB Công Thương.
3.
Công ty TNHH TS Việt Nam, (2023). Tài liệu lưu hành nội bộ.
4.
Công ty TNHH TS Việt Nam, (2020). Quy trình lập kế hoạch và điều độ sản xuất. Tài liệu lưu hành nội bộ.